News - Press Release
Why unconventional completions still face disruptions and why it’s not always a matter of equipment reliability.
As the scale of unconventional completions development has grown, the number of stages per well (and wells per pad) has increased significantly. On site this change has demanded an equivalent step up in efficiency to meet program timelines and budgets.
In a bid to deliver these efficiencies, much of the industry's technical focus to date has been on increasing capability; prioritizing factors such as higher pumping rates, more powerful equipment, and faster stage execution.
As a result of these improvements, the performance of today's surface systems is more reliable than ever.
So, given that equipment reliability has improved significantly, why does operational disruption remain common?
Over the past decade, automation has reduced the need for manual intervention while monitoring and control systems have become increasingly sophisticated. These advances have delivered measurable gains across unconventional completions. Yet many of the interruptions affecting day-to-day operations remain stubbornly familiar.
Where reliability breaks down
In the complex world of unconventional completions, the answer may lie in how reliability is defined in the first place.
Each individual element may function as designed, but no element operates in a vacuum. True reliability in this context is defined by how systems perform together from start to finish.
As the scale-up of operations continues, so does the number of interactions taking place across the wellsite. Each stage is now part of a wider sequence of activities involving different equipment, crews, workflows, and control systems. In this interconnected environment, disruption is less likely to be due to component failure, but rather to a delay caused during the transitions, handovers, and intervention points that connect one element or activity to the next.
And it’s a challenge that becomes amplified as completions programs expand. More wells, more stages, and more simultaneous activity all increase the number of dependencies that need to be aligned before operations can continue. The delayed actuation of a single valve, a surface reconfiguration, or a workflow requiring multiple manual interventions can temporarily interrupt progress across the pad, despite every system performing as planned.
Beyond keeping equipment running
Historically, reliability has been measured by the performance of individual equipment. But in high-cycle completions, where the same processes are repeated hundreds of times in rapid succession across a development campaign, operational continuity may represent a more meaningful measure. The question is no longer whether individual technologies are reliable, but whether the operation itself can sustain the same level of reliability across every stage, handover, and workflow.
After all, the objective is not simply to keep equipment running, but to keep productive work progressing. What if reliability were measured by continuity of operations rather than the performance of individual equipment?
As unconventional operations continue to evolve, the challenge is no longer simply eliminating equipment failures, but identifying and removing the sources of disruption embedded within the workflow itself.
What continuity looks like in practice
Operations that consistently deliver high levels of continuity tend to share common characteristics:
- Reduced need for manual observation and intervention
- Less reliance on separate systems
- Standardized workflows between stages and wells
- Equipment maintenance removed from the critical path
- Clear visibility across operations
These characteristics have no impact on the reliability of individual elements. Instead, they reduce how often completion operations are forced to pause.
By combining autonomous operations, proactive maintenance, and remote monitoring, the iComplete® high-performance surface pressure containment ecosystem significantly improved efficiency, reduced downtime, and supported safer, more consistent completion operations.
Considering the wider impact
Approaching and measuring reliability through the lens of continuity has implications across the entire unconventional well completions workflow. It can improve
- Schedule certainty
- Operational consistency between stages and pads
- Utilization of crews and equipment
- Coordination between systems, service providers, and workflows
A closing thought
If reliability measures are replaced with continuity goals, today's operators may find themselves revisiting long-held assumptions about workflow design, transitions, coordination, and system integration.
Equipment reliability and operational reliability are not the same thing.
More news
-
News | October 05, 2026
TechnipFMC Qualifies 66kV Dynamic Inter-Array Cable for Floating Wind
-
News | October 01, 2026
More Pumping Time, Less Idle Time
-
News | September 02, 2026
Electric propulsion is rewriting the rules of subsea work