Increased Production. Now.
A significant increase of Production can be achieved in a very short timeframe intervening in existing wells.
Increased Production. Now.
A significant increase of Production can be achieved in a very short timeframe intervening in existing wells.
Drilling a new well requires a rig, which needs to be contracted, and new production equipment, which needs to be built. This could take years.
With TechnipFMC’s RLWI, operators are able to increase Production in a matter of months instead of years.
Increased Production. Now.