Purple, Violet, Font, Rectangle

Remote Intervention Vehicle
The Future of Subsea Robotics

Gesture, Font
Gesture, Font
Purple, Violet, Font
Purple, Violet, Font, Rectangle

In need of Intervention services for your West Africa wells?

No need to despair. We will be back with our fully integrated vessel
Island Constructor, specially designed for RLWI missions, already in Q4 2022 –Q1 2023, so nThis will be our fifth time operating in the seas outside Angola, Nigeria and Equatorial Guinea in a multi-client campaign. For every year, we have shown a better track record of efficiency - both when it comes to putting wells back into production and significantly increasing production.







Since 2016, we have performed four multi-well RLWI campaigns in West Africa (Nigeria, Equatorial Guinea, Angola). All of them achieved the objectives safely and efficiently, resulting in significant production increase and largely paying off the project costs.

4 Campaigns = 4 Successes

In need of Intervention services for your
West Africa wells?

No need to despair. We will be back with our fully integrated vessel
Island Constructor, specially designed for RLWI missions, already in Q4 2022 –Q1 2023, so nThis will be our fifth time operating in the seas outside Angola, Nigeria and Equatorial Guinea in a multi-client campaign. For every year, we have shown a better track record of efficiency - both when it comes to putting wells back into production and significantly increasing production.







Since 2016, we have performed four multi-well RLWI campaigns in West Africa (Nigeria, Equatorial Guinea, Angola). All of them achieved the objectives safely and efficiently, resulting in significant production increase and largely paying off the project costs.

4 Campaigns = 4 Successes

We are already organizing our fifth campaign for Q4 2022 and Q1 2023, with upgraded water depth capabilities.

We are committed to efficiency
We get the job done and we move to the next one
We arrive ready for operations
Wait no more!

Unmatched efficiency

Average time per well (days:

2011

17

18

16

14

12

10

8

6

4

2


16

15

12

8.7

6.2

6.7

6.7

8.3

6.9

5.9

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

Why RLWI with Island Constructor













For the 22/23-campaign, we will upgrade our vessel with a brand new umbilical system. This will make operations in water depths up to 2,100 meters possible. Island Constructor arrives fully integrated in West Africa ready for operations.

Reduced environmental impact







Reduce wellhead stresses and fatigue













Reduced costs







Reduced POB and personnel exposure







Increased efficiency







Simpler setup and operations







RLWI

We are already organizing our fifth campaign for Q4 2022 and Q1 2023, with upgraded water depth capabilities.