Remote Intervention Vehicle
The Future of Subsea Robotics




Maximizing CO2 source-to-store performance through integrated condition and injection performance management.
This is Carbon Transportation and Storage Done Right.
From Concept to Delivery and Beyond.


Maximizing CO2 source-to-store performance through integrated condition and injection performance management.
This is Carbon Transportation and Storage Done Right.
From Concept to Delivery and Beyond.

Meet us at:
Carbon Capture Technology EXPO
in Houston June 28-29 2023
to learn more.


Meet us at:
Carbon Capture Technology EXPO
in Houston June 28-29 2023 to learn more.




North America PRESENCE
Over 30 service and manufacturing sites throughout North America
REDUCE RISK
THROUGH INTEGRATED PROJECT DELIVERY
CO2transportation systems will leverage upstream oil and gas technology and engineering expertise, and projects will need partners with strong execution capabilities, both onshore and offshore.
TechnipFMC has a long history of delivering integrated upstream transportation system solutions. Our integrated approach to design and execution reduces client and project risk by consolidating contractual interfaces and leveraging industrialized solutions.

No failures
IN THE INDUSTRY EXECUTING surface
AND subsea PROJECTS
50 YEARS
OVER

MAXIMIZE
INJECTION PERFORMANCE
The transportation system is responsible for delivering CO2 to the reservoir at the right conditions and making automated adjustments as changes in CO2 flowrate, pressure and composition occur.
Our system provides real-time, proactive CO2 condition and injection performance management for continuous injection control.
MONITOR
SYSTEM AND CO2 PERFORMANCE FOR THE LIFE OF THE ASSET AND BEYOND
The integrated control system software represents a digital twin of the asset and provides real-time, actionable insights for preventative facility and injection equipment management.
The injection system software is also used to collect and transmit data used for CO2 plume migration and pressure front tracking through downhole sensors in both injection and monitoring wells.

10
CO2 SURFACE INJECTION
WELLS DELIVERED SINCE 2019
No need to despair. We will be back with our fully integrated vessel
Island Constructor, specially designed for RLWI missions, already in Q4 2022 –Q1 2023, so nThis will be our fifth time operating in the seas outside Angola, Nigeria and Equatorial Guinea in a multi-client campaign. For every year, we have shown a better track record of efficiency - both when it comes to putting wells back into production and significantly increasing production.
COLLABORATION
COLLABORATION FOR SUCCESS
How can you reduce complexity and risk and at the same time set the best foundation for your project?
Early collaboration.
At TechnipFMC, we have proven this to be the most cost effective way to leverage field proven technology and improve project economics.